Our products include mixing valves and control units, floor heating bypass valves, hydraulic separator tanks and integrated pipe mixing units. Manufactured using advanced technology and high-quality materials, these products feature precise temperature regulation, energy-saving management and safety protection. We are committed to providing customers with efficient, stable and comfortable floor heating control solutions, and provide personalized customized services. Whether you are building a new building or upgrading an existing system, we can provide you with the best products and support based on your needs and requirements.

pro
Mixing valve unit H1003
pro
Tank Couplings H1007
pro
Mixing valve unit H1002
pro
Mixing Valve Unit H1008
We will strictly conduct three inspections for each inspection process from the beginning of raw materials to delivery of a product to ensure the quality and stability of the product.
VIEW MORE
img
Professional
procurement team
seek
We have an experienced procurement team with industry knowledge and procurement skills, who can provide customers with professional procurement suggestions and solutions.
Efficient procurement
process
seek
We have a complete procurement process, which can quickly respond to customer needs and ensure that the procurement process is efficient and smooth.
Favorable price and
flexible payment method
seek
Due to the good cooperation with suppliers, we are able to obtain favorable price and provide flexible payment method to meet the financial needs of customers.
cret
Our products are all in line with European
standards, you can rest assured to have long-term cooperation with us.
Production Process
01
process
Raw Material
Material Test for every lotAll incoming brass deliveries are color coded by type, each lot is randomly selected for internal Testing which includes composition analysis and brass hardness tests.
02
process
CNC Producing
The process of forging raw materials into specific products through equipment. Handing is adopting automatic hot forging machine, the machine's advantage is energyefficiency safety, temperature stability and environment protection.
03
process
Assembly line
Assembly work is performed by workers on the production line.
04
process
Testing
Different products have different testing equipment.
05
process
Finished product
06
process
Warehouse
07
process
Shipping
Customer Reviews
Very easy to install. It only requires an extra washer where it connects to the faucet, but the job is done in five minutes. No leaks and lovely new shiny hose.
The part that connects to the shower head fits perfectly. Happy to replace my old hose with this. Like the attachment is metal instead of plastic. Should be more durable.
cus-tou
John Smith
xing

0086 18869961798

0086 576-80732270

judy@handinghvac.com

GET A QUOTE

GET IN TOUCH NOW
×